US$ 34.95
ICI Hopper - 1973 to 1992 - Twin Pack E Wagon Type_ZZA Snow Plough in the period between May
$129.00
Description
in the period between May 1991 (when the first electrification mast was planted) and June 1993 (when load bank testing was completed)
Repainted in the controversial general grey paint scheme in May 1990
the 16 ton mineral wagon is an essential addition to the Accurascale range to tell the story of coal traffic on the railways throughout the 20th century
with an 11-ton capacity
Mark 2b Driving Trailer - 916
ICI Hopper - 1973 to 1992 - Twin Pack E Wagon Type_ZZA Snow Plough in the period between MayModel Shown is a decorated sample, and may not be fully indicative of the final model. Model specification; Highly detailed OO gauge model of the ICI Limestone Hopper, 1: 76. 2 scale on 16. 5mm track. Minimum radius Radius 2 Weight 44g. Detailed interior with rivets, framing, strapping and supports. Detailed chassis and bogies, with separate vacuum brake gear, vacuum hoses, hopper door controls, handbrake wheels and brake gear. Detailed multi piece
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 34.95
US$ 32.95
US$ 35.95